Permit Types

Municipal Consent - Township of North Stormont ($200.00)

Municipal Consent is the municipality’s authorization for a utility to occupy a specific location(s) within the municipalities right-of-way. Municipal Consent will only be issued to utility companies, commissions, agencies, other municipalities, or private applicants who have a municipal access agreement with the municipality applied to. The project of adding or modifying the plant is often subject to a Work in Right-of-Way permit.
Preview

Oversize/Overweight Load Trip Permit (OO Trip) - Township of North Stormont ($150.00 /per load)

An Oversize/Overweight Load - Trip Permit (OO Trip) is required for the transportation of a load(s) that exceeds the limits prescribed in the Highway Traffic Act (HTA), on a specific day(s), on a specific route, that is not already allowed for by a current Oversize/Overweight Load - Annual Permit (OO Annual).
Preview

Road Entrance Permit - Township of North Stormont ($150.00)

A Road Entrance permit is required to add or reclassify a permanent or temporary road entrance at a specific location. The project of adding or modifying the road entrance may be subject to a Work in Right-of-Way permit that is associated with the Road Entrance permit.
Preview

Work in Right-of-Way Permit - Township of North Stormont ($150.00)

A Work in Right-of-Way Permit relates to any activity that results in traffic disruption, including bins, materials and equipment blocking lanes, or the cutting, excavation, boring, filling, additions, or altering in any way, roadways, curbs, sidewalks, boulevards, ditches, trails, and other areas within the right-of-way. A traffic plan in compliance with the Ontario Traffic Manual (OTM), Book 7, Temporary Conditions for traffic plan instructions, may be required.

Application may be made to multiple road authorities with this service (e.g., county road, town sidewalk), by selecting the Multi-Jurisdiction option (coming soon).
Preview OTM Book 7